This consultation ended 2 November 2018.
Details of outcome
Summary of responses
,
file type: PDF, file size: 363 KB
PDF
363 KB
Original consultation
We are trialling speed limits on the motorway and 3 trunk roads across Wales to reduce nitrogen dioxide (NO2) levels.
Consultation description
This consultation seeks your views on:
- proposed final measures to achieve compliance with limit values for nitrogen dioxide (NO2) laid down by the Ambient Air Quality Directive (2008/50/EC)
- the Air Quality Standards (Wales) Regulations 2010 at locations on the motorway and trunk road network in Wales.
Consultation documents
Consultation document
,
file type: PDF, file size: 4 MB
PDF
4 MB
A494 Deeside – Welsh Transport Appraisal Guidance (WelTAG) Stage 3 Report
,
file type: PDF, file size: 3 MB
PDF
3 MB
A483 Wrexham – Welsh Transport Appraisal Guidance (WelTAG) Stage 3 Report
,
file type: PDF, file size: 3 MB
PDF
3 MB
A470 Pontypridd – Welsh Transport Appraisal Guidance (WelTAG) Stage 3 Report
,
file type: PDF, file size: 3 MB
PDF
3 MB
M4 Port Talbot J41-J42 - Welsh Transport Appraisal Guidance (WelTAG) Stage 3 Report
,
file type: PDF, file size: 2 MB
PDF
2 MB
M4 Newport J25-J26 - Welsh Transport Appraisal Guidance (WelTAG) Stage 3 Report
,
file type: PDF, file size: 2 MB
PDF
2 MB
Impact Assessment Report: Consideration of interventions on the Welsh Government Trunk Road and Motorway Network for Nitrogen Dioxide reduction
,
file type: PDF, file size: 20 MB
PDF
20 MB